JK Tyre · Tyre manufacturing

Building real-time production intelligence across critical tyre processes

Kavax connected shop-floor processes including mixing, calendering, and cutting to create a reliable operational system of record, improve process control, and synchronize production with ERP.

8–10%productivity improvement
5%quality improvement
Real-timeERP synchronization

The challenge

Creating a reliable operating baseline.

  • Production and downtime information was recorded manually after shifts, creating delay and data-quality problems.
  • Operators and managers lacked real-time visibility into output, losses, and cycle adherence.
  • Critical process variables were not trended consistently, limiting early identification of process drift.
  • Manual production and material booking created an 8–12 hour lag in inventory and planning information.

Kavax delivery

Connecting data, decisions, and workflows.

  • Streamed machine and process data from high-impact tyre-manufacturing assets into a shared operational layer.
  • Delivered live production, output, cycle, loss, and downtime views for operators and management.
  • Implemented process-parameter trending, SPC, Cp/Cpk analysis, and control-limit alerts.
  • Enabled immediate downtime classification at the operating interface.
  • Automated bi-directional synchronization of production and inventory information with ERP.

Business outcomes

Measurable operational improvement.

  • 8–10% productivity improvement on connected lines through faster action on visible losses.
  • 5% quality improvement supported by process analytics and earlier intervention.
  • More reliable inventory, loss, and order-accounting information.
  • Faster order closure and improved production planning inputs.
  • A common digital architecture for future multi-plant scale.

Apply the learning

Build a practical performance roadmap for your operation.

Discuss a similar challenge